Pine Township - Baur Drive Sanitary Sewer Extension (GEDF)

Pine Township
Baur Drive Sanitary Sewer Extension - 13-GEDF-009
Bid Opening Date:  August 14, 2014
Estimate $500,000 +/-

 

 

Short description of the project:  Work included under this project consists of about 1,135 linear feet of 8" gravity sanitary sewer construction, connection to the existing service sewer between the house and existing on-lot disposal system, construction of 1,625 linear feet of 1.25" low-pressure force main via open cut or directional drilling methods, installation of 7 individual grinder pump assemblies and appurtenances there to including, exterior control panel and interior electrical supply from the existing power supply/breaker box to the exterior grinder pump control panel for a complete and operational sanitary sewer system serving twelve houses on Baur Drive.

Bids received by:
These are unofficial results subject to the engineer's review.

Contractor Bid Amount
 Plavchak Construction $497,236.44
 Glenn Johnston Inc. No Bid
 WM Aiken & Son $462,935.19 
 Rudzik Excavating $411,979.70
 Stefanik's Next Generation Contracting  No Bid
 Martino, Inc. No Bid
 Pollard Land Services, Inc. $441,976.44
 Wislon Excavating No Bid



Technical questions regarding the bid package may be submitted to the project engineer, Jason Stanton, P.E., Lennon, Smith, Souleret Engineering, Inc.  (412) 264-4400.