Pine Township - Baur Drive Sanitary Sewer Extension (GEDF)
Pine Township
Baur Drive Sanitary Sewer Extension - 13-GEDF-009
Bid Opening Date: August 14, 2014
Estimate $500,000 +/-
Short description of the project: Work included under this project consists of about 1,135 linear feet of 8" gravity sanitary sewer construction, connection to the existing service sewer between the house and existing on-lot disposal system, construction of 1,625 linear feet of 1.25" low-pressure force main via open cut or directional drilling methods, installation of 7 individual grinder pump assemblies and appurtenances there to including, exterior control panel and interior electrical supply from the existing power supply/breaker box to the exterior grinder pump control panel for a complete and operational sanitary sewer system serving twelve houses on Baur Drive.
Bids received by:
These are unofficial results subject to the engineer's review.
Contractor | Bid Amount |
Plavchak Construction | $497,236.44 |
Glenn Johnston Inc. | No Bid |
WM Aiken & Son | $462,935.19 |
Rudzik Excavating | $411,979.70 |
Stefanik's Next Generation Contracting | No Bid |
Martino, Inc. | No Bid |
Pollard Land Services, Inc. | $441,976.44 |
Wislon Excavating | No Bid |
Technical questions regarding the bid package may be submitted to the project engineer, Jason Stanton, P.E., Lennon, Smith, Souleret Engineering, Inc. (412) 264-4400.